Renfrew Bridge reopening timescales raised as it remains out-of-use due to storm damage
Source ↗
👁 0
💬 0
In the aftermath of the storm, electric systems that operate the bridge suffered serious water damage, with extensive damage in one of the bridge’s two operation plant rooms.
Comments (0)