🇦🇺 Australia 7h ago · Neil Watkinson

Heavy rain hasn’t dampened gold plant conversion work at Maritana Minerals’ Black Swan project

Kalgoorlie Miner
Kalgoorlie local news
View Channel →
Heavy rain hasn’t dampened gold plant conversion work at Maritana Minerals’ Black Swan project
Source ↗ 👁 0 💬 0
Heavy rain has created a pond where the CIL tanks need to go but that’s all part of the challenge as Maritana Minerals charges on with converting the Black Swan nickel plant into a gold processing facility

Comments (0)

Sign in to join the discussion

More Like This

The Snoop: Nine editor’s U-turn on mainstream press, DFAT’s secrecy on aid worker death, and more
Crikey · 1h ago
Canberra is ‘drinking the Kool-Aid’ on AI. Where will it take us?
Crikey · 1h ago
Multi-vehicle crash on Stirling Highway triggers emergency response as drivers are told to avoid the area
The West Australian · 1h ago
Coach Andrew McDonald defends Australian batting: ‘No.1 ranked team for a reason’ 
7NEWS · 1h ago
Big bank, real estate site in lockstep on house prices
The West Australian · 1h ago
Popular haircare brand Bouf drops The Hairmaster slick stick for taming frizz and flyaways
7NEWS · 1h ago