🇿🇦 South Africa 9h ago

Durban rail set for R11bn overhaul as PRASA targets trains every 3 to 5 minutes

IOL South Africa
View Channel →
Durban rail set for R11bn overhaul as PRASA targets trains every 3 to 5 minutes
Source ↗ 👁 0 💬 0
PRASA is investing R11bn in signalling and telecommunications infrastructure in KwaZulu-Natal, with a further R2bn earmarked for the Umlazi Corridor. The projects are intended to improve rail safety, reliability and service frequency.

Comments (0)

Sign in to join the discussion

More Like This

Stormers beat Connacht 29-15 to start URC campaign with five-point win
IOL · 2h ago
Hansie Cronje’s siblings remember him on his birthday
The South African · 2h ago
Sloppy Stormers fire late to make winning start to URC campaign
The South African · 3h ago
Weather: Wet and stormy conditions expected this weekend
The South African · 3h ago
WATCH: Zulu girl steals the show at matric dance in stunning traditional attire
The South African · 5h ago
The Daily Lotto results for Friday, 25 September 2026
The South African · 5h ago